Cleaning of the landfill in Lower Austria: Husseln for the environment!

Cleaning of the landfill in Lower Austria: Husseln for the environment!

In the Lower Austria region, a landfill is carried out complete, which was concluded in December of last year after the state's environmental and investment rights intervened. This was necessary after large-scale trial decases and chemical analyzes revealed that not sufficiently treated material was deposited there, such as Kleine Zeitung reported.

In early March, the laboratory results were available that confirmed the unsuitable material. Expert reports were drawn up as part of the procedural order in order to determine the necessary goals and measures. These reports were also published as part of the party belonging and are decisive for the upcoming actions. The complete evacuation will be part of this procedural order.

monitoring and aftercare

An accompanying examination is provided for monitoring the excavated material. Unsuitable material must not remain in the landfill and must be treated. Suitable material, on the other hand, can be temporarily stored in the landfill. The authority assesses the renovation effort as "very high", which indicates the complexity of the Situation.

In this context, procedures were also initiated by the public prosecutor's office. The customs authorities and the responsible ministry are actively involved in the investigation. Greenpeace has repeatedly criticized the processes in the landfill and filed a criminal complaint against the operator, Zöchling Waste Ververwand GmbH. However, the company rejected the allegations and made it clear that the landfill has no environmental risk.

regulations and analyzes

The upcoming measures for evacuation and renovation are involved in the framework of the applicable legal requirements. The landfill regulation (DEPV) regulates the construction and operation of landfills as well as the specific test procedures for dangerous materials. These analyzes play a central role in environmental protection by identifying and contributing pollutants to fulfill legal requirements, such as Explained.

For the landfills, strict requirements apply in the landfill regulation. Waste producers must characterize their waste and ensure that they correspond to the pollutant limit values. From 2005 only pretreated settlement waste could be deposited on landfills to prevent the formation of landfillas, especially methane.

The continuous analysis of the deposits is crucial to minimize environmental pollution. The relevant parameters, such as dry substance and heavy metals, must be checked regularly. Only accredited laboratories are authorized to carry out the necessary analyzes to ensure that all standards are observed, in accordance with BMU .

Details
OrtDeponie, Österreich
Quellen

Kommentare (0)