Completion of Schönabrunner Straße: Improved connection for Prellenkirchen

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

The construction work on the L 165 Schönabrunner Straße in Prellenkirchen has been completed. Learn more about the improvements and the effects on residents and traffic.

Completion of Schönabrunner Straße: Improved connection for Prellenkirchen

In Pellenkirchen, the construction work on Schönabrunner Straße, which is part of the state road L 165, recently successfully completed. This street runs between the villages of Schönabrunn and Prellenkirchen and was closed to a comprehensive renovation.

The measures included not only the renewal of the road, but also the improvement of traffic safety through various infrastructural adjustments. The renovation work has a significant improvement in driving conditions, which benefits both the residents and the commuters. The construction site was a need to meet the requirements of modern traffic routes.

Construction time and course of the work

The construction work enclosed a period that was well organized in order to keep the inconveniences for residents and traffic as low as possible. Despite possible delays due to adverse weather conditions and unforeseen circumstances, the work could be completed in the time frame. According to the official information, close cooperation between the local authorities and the executing companies was necessary to ensure a rapid completion.

The residents were largely positive about the construction work, since the street infrastructure is a decisive element for the quality of life in the region. The availability of a well -maintained road is important in order to promote the safety in road traffic and to ensure the preservation of the environment.

For a detailed view of the case, See the report on www.meinbezirk.at.