Full closure of the Ruhrölstraße in Bottrop: traffic turn in sight!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Full closure of the Ruhrölstraße in Bottrop from January 13th to 24th, reason: new connection of a power line.

Full closure of the Ruhrölstraße in Bottrop: traffic turn in sight!

The Ruhrölstraße in Bottrop will be completely closed from Monday, January 13th, until January 24, 2025. This affects the section of house number 1a, where Lüth GmbH is located, to the Braukstraße intersection (B224). The turning tracks on Braukstraße are not accessible throughout the closure.

The blocking is required to make a new connection of a power line. However, access to the Ostermann and Toom shops remains guaranteed via Horster Straße/Ruhrölstraße, as both the Bottroper Zeitung href = "https://www.presse-service.de/public/single.aspx?iid=1176213"> press-service reported.

Details for blocking

The complete blocking of Ruhrölstraße leads to restrictions in the entire flow of traffic on this important traffic artery. Drivers and pedestrians should use the diversions to avoid the blocked areas. The city of Bottrop informs that the blocking is related to the urgently needed infrastructural measure.

The Press and Public Relations of the City of Bottrop is available for further information. The contact details are: Ernst-Wilczok-Platz 1, 46236 Bottrop, Tel.: 02041 7030, email: press@bottrop.de, web: www.bottrop.de.

-transmitted by West-East media

Quellen: