B82 renovation: traffic chaos in Lutter threatens from Monday!
Renovation work on the B82 near Lutter will begin on October 14th with diversions. Warranty defects and impact damage will be repaired.
B82 renovation: traffic chaos in Lutter threatens from Monday!
There is news in the transport sector in Lower Saxony: The state authority for road construction and transport has announced important renovation work on the B82, which will also affect the flow of traffic. These measures are necessary to correct several warranty defects on the bridge near Lutter, more precisely at the junction to the L496.
The repairs include sealing hollow spots and cracks in the concrete as well as repairing impact damage that affects the safety of the infrastructure. Work is scheduled to begin on Monday, October 14th and is expected to be completed by Friday, October 18th. This work is important not only for economic reasons, but also to ensure safety for all road users.
Details about traffic control
In order to regulate traffic during the renovation work, there are special diversion regulations: Drivers who want to go from Goslar towards the A7 motorway and Seesen must take a detour via the L496 to Lutter am Barenberg and then continue via the B248 back to the B82. This measure is necessary to avoid traffic congestion and possible accidents during construction work. However, the route in the opposite direction remains without diversions, which is a relief for commuters.
The state authority asks all road users to be understanding and considerate throughout the entire construction period. It is recommended to consider alternative routes and check current traffic information during this time.
For more information about the road construction situation and any changes in traffic flow, please see the Reporting on regionalheute.de.