Coming full closure: Start construction work at the Gördenallee level crossing!
Coming full closure: Start construction work at the Gördenallee level crossing!
In Brandenburg an der Havel, extensive construction measures are imminent at the Gördenallee level crossing, which will bring significant changes for drivers and residents. From October 25th at 6:00 p.m. to October 29, 2024 at 4:00 a.m., the level crossing will be completely blocked. This is necessary to carry out various urgently required work that had been announced over a long period of time.
Deutsche Bahn AG has informed the road traffic authority that the track plates must be replaced in the area of the level crossing. This is essential to ensure the safety and functionality of rail transport. At the same time, the municipal building yard is planning to make an improvement work on the roadway area and the Brawag announced that the construction measures necessary to carry out the necessary construction work. These bundled work should be carried out during the autumn holidays in 2024 to keep the impairments for traffic and residents as low as possible.
Details on the construction work
The construction work includes the renewal of the track covering and repair work on the road surface in the section between the level crossing and the Gördenallee, Veilchenweg and Mendelssohnstraße. These measures are designed to sustainably improve both tracks and road quality.
An important part of the work is the exchange of fittings on the DN 400 drinking water management by Brawag. This work must be carried out in parallel to the other construction measures in the period mentioned to ensure the drinking water supply in the area. In order to carry out this work efficiently, the road is blocked in addition to the full closure in several places. This could lead to traffic disruptions in the area, while the work is continued.
In order to avoid delays in the construction process, Weberstraße and Geranienweg at the Gördenallee junction will be completely closed from October 21. This early blocking should run smoothly, so that the Bauerei can be completed on time. The road traffic authority will inform the public about further details on the full closure and publish a corresponding transport notification in good time in order to draw all road users aware of the necessary diversions.
These comprehensive measures are an important step to keep the infrastructure in Brandenburg an der Havel on a high standard and ensure the future supply of the population with water and the safety in rail traffic. For additional information about the schedule and possible changes in traffic, it is recommended to pursue the official channels of the city of Brandenburg, as listed at www.stadt-brandenburg.de .
Kommentare (0)