Channel damage in Bad Kissingen: Rosenstrasse closed for four weeks!
Channel damage in Bad Kissingen: Rosenstrasse closed for four weeks!
In Bad Kissingen there is an alarm mood! Shocking damage in the canal line was discovered that require immediate measures. In a press release, the city confirmed that Rosenstraße has to be blocked for several weeks to fix the serious problems.
The channel TV examination has shown that the rainwater canal in Rosenstrasse is acute. In order to prevent possible collapse of the channel and dangerous settings in the road area, urgent channel renewal is necessary. From Monday, November 18, the street will be closed to all traffic. The full closure extends from the confluence with Schützenstraße to Boxbergerstrasse and is expected to last for four weeks. However, pedestrians can still pass while redirecting for vehicle traffic is set up.
urgent measures required
The city administration quickly acts to ensure the safety of residents and road users. The renewal of the channel is not only important to protect the infrastructure, but also to avoid greater damage in the future. The affected residents and road users are asked to adjust to the diversion and to consider the blocking.
Details | |
---|---|
Ort | Rosenstraße, 97688 Bad Kissingen, Deutschland |
Kommentare (0)