Attention drivers: Ambergtunnel closed at night from Monday!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Night closures in the Amberg Tunnel from April 7, 2025 for tunnel cleaning and maintenance work, diversion via L 190. Details on closure times.

Attention drivers: Ambergtunnel closed at night from Monday!

From Monday, April 7, 2025, the Amberg Tunnel will be closed at night due to tunnel cleaning and maintenance work. Loud vol.at ASFINAG begins night shifts at 8 p.m., which will last until the early hours of the morning.

Traffic will be redirected via the L 190 state road during the closure times. This diversion is well signposted on site and ensures that traffic is routed via the junctions in Feldkirch and Frastanz. This is intended to minimize disruption to road users during maintenance work.

Closing times in detail

The exact closure times for the Amberg Tunnel are as follows:

  • Oströhre (Fahrtrichtung Bregenz):
    • Montag, 7. April, ab 20 Uhr bis Dienstag, 8. April, 6 Uhr
    • Dienstag, 8. April, ab 20 Uhr bis Mittwoch, 9. April, 6 Uhr
    • Montag, 14. April, ab 20 Uhr bis Dienstag, 15. April, 6 Uhr
    • Dienstag, 15. April, ab 20 Uhr bis Mittwoch, 16. April, 6 Uhr
  • Weströhre (Fahrtrichtung Innsbruck):
    • Mittwoch, 9. April, ab 20 Uhr bis Donnerstag, 10. April, 6 Uhr
    • Donnerstag, 10. April, ab 20 Uhr bis Freitag, 11. April, 6 Uhr
    • Mittwoch, 16. April, ab 20 Uhr bis Donnerstag, 17. April, 6 Uhr
    • Donnerstag, 17. April, ab 20 Uhr bis Freitag, 18. April, 6 Uhr

The focus of this night work is on thoroughly cleaning the tunnel and carrying out necessary maintenance work that is essential for the safety and smooth operation of traffic. ASFINAG also informs that the access routes and diversions are well signposted to ensure traffic flow. Further information on this is available on the ASFINAG website, as described in the article by ASFINAG executed.