Refurbishment of sidewalk in Vienna-Meidling: Start on October 8th
Refurbishment of sidewalk in Vienna-Meidling: Start on October 8th
In Wienerbergstrasse in the Meidling district, residents and passers -by can adapt to some changes. From October 8th, extensive renovation work on the walking stands will begin, which should ensure a better pedestrian infrastructure.
The renovation work affects the sidewalks on both sides of Wienerbergstrasse and extend between Pottendorfer Straße and Eibebrunnergasse as well as between Rotdornallee and Kögergasse. The city of Vienna has already announced that the work will mainly take place during the day in order to disturb the traffic as little as possible. During the construction phase, a trace remains free in the respective construction site areas, so that pedestrians can continue to pass.
planned duration and reasons for the measures
The work should be completed by October 24th. This measure is necessary after old excavation work and time damage were found, which made a renovation of the sidewalks inevitable. In order to ensure a safe passage to the pedestrians, a replacement slide was set up.
These initiatives announced by the City of Vienna on Friday are part of a more comprehensive plan to improve pedestrian friendliness in the region. The city wants to ensure that all citizens can navigate and safely navigate through the streets.
For further information on the work and progress of the construction work, interested citizens can read here . These measures are another step towards a more attractive and safer city for everyone.
Kommentare (0)