Recreation in rail traffic: Tullnerfeld and surrounding lines take up speed

Recreation in rail traffic: Tullnerfeld and surrounding lines take up speed

After the devastating damage caused the flood in the Eastern region, there is positive news for the commuters. Middle and regional traffic will be resumed gradually. The Verkehrsverbund Ostegion (before) has announced that important rail connections are restored faster than expected.

From Monday, the direct rail connection of the CJX5 line between Tullnerfeld, Hütteldorf and the Vienna Westbahnhof will be put back into operation. This means that the Tullnerfeld train station, if only to a limited extent, is open again. With the help of a replacement power supply, the technology is functional again, so that the platforms can be used for commuting traffic. This information was confirmed in an official notification.

Further connections are resumed again

Starting from Saturday, the S50 will also resume its journey between the Vienna Westbahnhof and Unter Purkersdorf. An expansion of the S40 line to Tullnerfeld is also announced, and the S4 will also be reactivated in the section between Absdorf-Hippersdorf and Tullnerfeld. Another important step will take place on November 11th, when the amplifier trains of the R40 line between Vienna Franz-Josefs-Bahnhof and St. Andrä-Wördern.

The VOR is planning that the upcoming timetable change on December 15 will be restored to the entire offer in local, regional and long-distance transport in the Ostregion. Up to this point, however, a rail replacement traffic remains to ensure the mobility of passengers and offer uninterrupted travel options.

Overall, the developments indicate that the region gradually returns to normal after the flood ranges. Commuters can be pleased that you can soon access usual rail connections, and who works to normalize the traffic as quickly and efficiently as possible. For more detailed information, such as B. Specific travel times, can the latest reports on noe.orf.at

Kommentare (0)