Control narrowing in Neunkirchen a. Sand: traffic jam until the end of November 2024
Control narrowing in Neunkirchen a. Sand: traffic jam until the end of November 2024
drivers in Neunkirchen a. Sand have to prepare for some challenges if you drive on the main street. There are currently traffic restrictions that are mainly caused by a narrowing of the road. This situation lasts until November 28, 2024, which means that commuters and travelers should be particularly attentive.
such persistent construction sites are not unusual in Germany, where the road network is one of the largest in the world. Constant maintenance work is required to ensure safety and efficiency for users. At the moment there are drivers on the main street of Neunkirchen a. Sand affected where the road only releases an alternating lane for both directions.
Details of the traffic restrictions
The restrictions concern the main street (ST2241) in Neunkirchen a. Sand, more precisely between the districts of running and Hiltpoltstein. Temporary temporary traffic light systems regulate traffic because bridge work is currently being carried out with a length of 120 meters. This can lead to increased traffic or traffic jams. The exact times for these measures are set: from Monday, September 30, 2024, 7:30 a.m. to Thursday, November 28, 2024, 6:00 p.m.
The situation can also be felt on the opposite direction between Röttenbachgrund and Kirchengasse, which influences the entire traffic situation in the region. Drivers should prepare for adapting their routes accordingly and driving carefully to navigate through the disabilities.
For current information, a look at the traffic reports of the Central Office for Transport Management Bavaria, which regularly report on the work on site. It is also worthwhile for further details, to follow the reporting of www.news.de
Kommentare (0)