Massive traffic jam: up to 46 kilometers of traffic on the A10!

Massive traffic jam: up to 46 kilometers of traffic on the A10!

Wien, Österreich - travel to the south is currently severely impaired. Last weekend, the Tauern Autobahn (A10) between Golling and Throwing of Massive Councilor was affected, which reached a length of up to 46 kilometers. As reported [ots.at] (https://www.ots.at/presseaus-sung/ots_20250614_ots0004/arboe-Massiver-zeit- Zeit-im- Reise-im- Reise-direction-Sueden), a dating of 25 kilometers occurred at 8 a.m. Drivers have to expect up to four hours with a loss of time.

In order to optimize the traffic situation, a departure lock was ordered, the drivers indicated that they remain on the highway. The B159 is also overloaded and contributes to the traffic jam problem. The police inform that tough traffic was found on the Brenner Autobahn (A13), with a loss of time of almost one hour between Innsbruck and the Brenner Pass at 8 a.m.

Current traffic situation and lock

In addition to the situation on the A10, local events also ensure traffic disruptions. The rainbow parade in downtown Vienna leads to locks on the ring. The area between Stadiongasse and Schottengasse is closed until 12:00 p.m., followed by further closures of the entire ring. Current information about these traffic situations are available on the website www.arboe.at/infos/verkehrsinformationst.

The Tauern Autobahn (A10) is an important traffic artery that connects Salzburg with Villach and acts as a central north-south connection for tourists from Germany to Italy. The expansion state with 2 × 2 and sometimes 2 × 3 lanes should reduce the traffic load during the main travel times. [stummeder-karte.at continues to provide current traffic information and reports that construction sites often lead to traffic jams, especially between Hallein and Kuchl and between Gmünd-Maltatal and iron rats.

background to the Tauernautobahn

The Tauern motorway plays a crucial role for the trade routes between Villach/Klagenfurt and Salzburg. The volume of traffic in this section is particularly high in the summer weekend, which often leads to overload. A second tunnel tube of the Tauern tunnel was put into operation in 2011 to improve the flow of traffic and minimize traffic jams.

The traffic statistics in Germany clearly shows that overload on highways is increasing, especially during vacation periods. As reported in the standard work "Traffic in Numbers", the survey is essential for understanding mobility and traffic in Germany. This important data provides information about the steadily growing problem of traffic overload and the infrastructural challenges that the authorities face. bmv.de offers detailed reports of investments in the transport infrastructure as well as data on accidents and emissions.

Details
OrtWien, Österreich
Quellen

Kommentare (0)