Bridge over the Brunnbach: One step into the future of flood protection!
Bridge over the Brunnbach: One step into the future of flood protection!
in Kirchberg, where Brunnenstraße leads towards the tennis courts, a new bridge over the Brunnbach is currently being built. What initially seems puzzling is an important project that the section manager Christian Amberger explains from the torrent construction: "We are building the parts for the new bridge to cross the Brunnbach through the Mariazellerbahn." This new connection replaces the hydraulically inadequate existing bridge and represents an important step towards flood protection, as meinbzirk.at reports.
The completion of the bridge is planned as a logistical challenge, because installation can only be carried out in the so -called revision window of the Mariazellerbahn, which is in March 2025. "Then we will precisely insert the components with a powerful autocran," explains Polier Manfred Klauser. The structure will not only ensure the accessibility to the Mariazellerbahn, but will also contribute to the improvement of regional flood security. It is crucial for the Allguth team that such infrastructures are not only built, but also thought sustainably in terms of the position of employees and future growth. According to allguth.de , the Amberger, which are behind the Allguth company philosophy, have a clear vision for their company that includes values as well as practical feasibility.
This merger of infrastructural and entrepreneurial strategies shows how well -thought -out planning efficiently combines both regional transport links and flood protection. A role model for other communities that want to tackle similar challenges is the clear view of sustainable growth and infrastructure development, which also respects the relationship value between the company and community.
Details | |
---|---|
Ort | Brunnenstraße, 3202 Kirchberg, Österreich |
Quellen |
Kommentare (0)