Luegbrücke: traffic jams and single -track traffic routing provide patience!

Luegbrücke: traffic jams and single -track traffic routing provide patience!

A accident drama occurred today when a truck on the A13 came to a standstill due to an engine damage and the highway blocked for a full hour. Drivers and truck drivers had to be patient in endless traffic jams. According to information from orf tirol , the accident vehicle was towed around 7:00 a.m., which ultimately led to the re -release of the Luegbrücke. The bridge has only been accessible since January 1, 2025, as extensive renovation work is due.

traffic forecasts and structures

like Verkehrsinfos IT , the north and southern lane of the Luegbrücke was reduced to a trail per direction. This single -lane traffic routing can lead to further delays and traffic jams, which already became clear during today's incident. In order to avoid overload, trucks over 3.5 tons are directed from the right lane to the left lane so that the bridge is relieved. In addition, an integrated weight control will ensure that heavy vehicles are directed from the bridge in good time, there should be a violation.

For the safety of all road users, new markings are introduced on the burner highway. Between Matrei and the Brenner State limit, the A13 is redesigned by three to two lanes. Dangerous situations can be expected, especially on climbing ramps. In order to protect residents from traffic jams and undesirable traffic, barrier systems and dosing lights are also installed. Further information is available on the ASFINAG website.

Details
OrtLuegbrücke, Österreich
Quellen

Kommentare (0)