A61 closure: Stammfarf Relge between Bad Kreuznach and Bingen in November!

A61 closure: Stammfarf Relge between Bad Kreuznach and Bingen in November!

drama on the A61 in Rhineland-Palatinate! From November 8th, the motorway between Bad Kreuznach and Bingen will be completely blocked in the direction of Koblenz. The construction work, which lasts until November 10, is urgently necessary to repair the road. Drivers have to adjust to massive traffic disruptions - traffic jams are inevitable!

detour and Details on the blocking

The blocking affects the route between the Bad Kreuznach and Bingen-Mitte junction. The detour takes place via a single -lane parallel lane in the Nahtal motorway triangle, which leads the traffic past the construction site. After the nearby triangle, the vehicles can return to the main lane. These measures are essential to ensure the safety of drivers and to keep the highway in an optimal condition.

Caution! Autobahn GmbH warns: The full closure is subject to suitable weather. In bad weather, the work could be postponed. A look back shows that the A61 was only closed in spring due to renovation work on the Moselle Valley Bridge. The situation remains tense and drivers should adjust to the changes in time!

Details
OrtBad Kreuznach, Deutschland

Kommentare (0)