B54 in Lünen: Important blocking from Monday - note detours!
B54 in Lünen: Important blocking from Monday - note detours!
The streets. NRW regional branch Ruhr has published an important message for all road users in Lünen. From Monday, October 14th, the B54, also known as Dortmunder Strasse, in Lünen, in fact, in the area of the intersection with the B236, will probably be completely blocked for two weeks. This is necessary because the road is rebuilt and paved. Such measures are essential to ensure the safety and quality of the street infrastructure.
affected connections during the blocking
In addition to the blocking of the road there, additional connections are affected. So it will no longer be possible from Lünen to drive directly to the B236 and to the A2 cross Dortmund-Nordost. The B236 in the direction of Dortmund-Brechten also remains closed during the construction work. These interventions are part of the extensive work that should help to improve traffic conditions in the region.
The information is particularly important for road users that certain connections are maintained despite the blocking. So it remains possible to get to the B236 and the Dortmund-Nordost A2 cross from Dortmund-Brechten and to drive from the B236 towards Lünen.
Temporary speed limits and diversions
In the immediate area of the work, a speed limit is also introduced to 50 kilometers per hour to ensure the safety of workers and road users. For the spacious diversions, the road users are signposted with a red dot to offer them alternative routes and avoid traffic jams.
For everyone who is traveling regularly in this area, it is important to consider the upcoming changes and, if necessary, inform themselves about the best alternative routes in advance. Further details on this construction project and the possible effects on traffic can be found on the project page www.luenen.de be read.
Kommentare (0)