Calberlah获得了21个新的停车位:Stop的扩展开始了!
Calberlah获得了21个新的停车位:Stop的扩展开始了!
Calberlah, Deutschland - big news from Calberlah! The park-and-ride system at the train station is finally being expanded!该项目的预算令人印象深刻,预算为380,000欧元,仅在六到八周内完成,该项目由较低的萨克森州和布劳恩斯奇韦格地区协会慷慨资助。 Mayor Phillip Passeyer said optimistically: "It took a long time. Now it is time!" The planning took several years because Deutsche Bahn wanted to take the possibility of a future expansion of the ICE route into account. Now a 30-year lease was concluded with the property owner, which paves the way for this improvement.
“大约700平方米的区域上有21个额外的停车位 - 这对通勤者来说是个好消息!” Passeyer在开创性的仪式上欢呼。该项目表明了市政当局,德意志·巴恩(Deutsche Bahn)和财产所有人之间的合作程度。区域协会主席Detlef Tank赞扬了铁路远视的铁路,该铁路释放了冰路,以供未来的发展。 "The infrastructure must be right," emphasized Tanke to promote the use of public transport.
parking remains free!
所有通勤者的好消息:停车仍然免费! With the expansion of the park-and-ride facility, the often chaotic parking situation along Bahnhofstrasse will belong to the past.市政当局计划使停车的总体吸引力更具吸引力,尤其是为了考虑计划从2027年开始对冰路线进行翻新。
Details | |
---|---|
Ort | Calberlah, Deutschland |
Kommentare (0)