Roof renovation of IGS Wismar: Students have to move!

Roof renovation of IGS Wismar: Students have to move!

Wismar, Deutschland - In Wismar it is bubbling: The district college is facing a dramatic turn! District Administrator Tino Schomann (CDU) has announced that emergency security measures for the ailing roof will begin from February 2025. The urgent construction work that should start during the winter holidays are not only overdue, but also cost a whopping ten million euros! A huge amount that should start the urgently needed renovation of the entire building. But the question remains: how long will school be closed?

The effects are already noticeable! During the construction work, there will be no lessons in certain areas of the adult education center. The students of the integrated comprehensive school "Johann Wolfgang von Goethe", which are currently being taught in the district college, are particularly affected, since the rooms of the comprehensive school are already fully utilized. A total of three classes are affected, and where these students are accommodated during the renovation work, there is a big mystery. The uncertainty hovers over the heads of the students and teachers like a dark shadow.

urgent measures required

The need for the renovation is undeniable! The roof of the district college is in a critical condition, and the planned measures are a first step in the right direction. But the uncertainty about the duration of the construction work and the accommodation of the students ensures nervousness. Those responsible face the challenge of finding a solution that guarantees both the safety of the students and the progress of the lesson. The Situation remains tense and all eyes are aimed at the coming months in which the construction work should begin.

Details
OrtWismar, Deutschland

Kommentare (0)