Villach的交通混乱:12月的建筑工程
Villach的交通混乱:12月的建筑工程
In December, the city of Villach is severely affected by a number of construction work, which will lead to significant traffic disruptions.这些措施会影响城市地区的不同街道,重要的是要对此进行适应,以避免可能的交通拥堵和延误。
A focus of the work is on the expansion of the fiber optic infrastructure. These excavation work will be carried out in several streets by December 13th. Affected areas are the B 86 Villacher Straße, Neubaugasse, Villacher Schächtestraße and Warmbader Straße. In particular, the entrance to Tobias-Bürg-Straße from the Kilzerbrücke roundabout in the direction of Warbader Allee will be closed. The detour leads via Heizhausstraße, Othmar-Crusiz-Straße, Urban-Görtschacher-Straße and the Warmbader Allee.
施工工作的详细信息
- 沿卫士Allee的沥青工作,从B 86 VillacherStraße桥到45号房屋,也导致交通中断,直到12月13日。 A one -way regulation is set up here, which requires a detour via Villacher Schächtestraße and the B 86.
- In addition, repair work will be carried out in Brauhausgasse by December 13, which also affect traffic.
- 从12月2日至12月18日,在与Franz-von-Assisi-Straße交汇处的Karl-Renner-Straße博士的建筑工地创建工作导致进一步的交通中断。
这些铺路和扩展工作是改善villach的基础设施并使能够访问现代技术(例如快速互联网)的努力的一部分。尽管这些措施是必要的,但这意味着在接下来的几周内为城市的驾驶员提供耐心,因为交通可能会发生不可预见的延误。当前的施工网站的信息和更新是通过本地媒体进行的,例如Dezember-fuer-vuer-verkehrs-vilkehrs-in-villach/”
Kommentare (0)