Traffic chaos in Villach: Construction work in December

Traffic chaos in Villach: Construction work in December

In December, the city of Villach is severely affected by a number of construction work, which will lead to significant traffic disruptions. These measures affect different streets in the urban area, and it is important that drivers adjust to this in order to avoid possible traffic jams and delays.

A focus of the work is on the expansion of the fiber optic infrastructure. These excavation work will be carried out in several streets by December 13th. Affected areas are the B 86 Villacher Straße, Neubaugasse, Villacher Schächtestraße and Warmbader Straße. In particular, the entrance to Tobias-Bürg-Straße from the Kilzerbrücke roundabout in the direction of Warbader Allee will be closed. The detour leads via Heizhausstraße, Othmar-Crusiz-Straße, Urban-Görtschacher-Straße and the Warmbader Allee.

Details on the construction work

  • The asphalting work along the Warmbader Allee, starting at the B 86 Villacher Straße bridge to house number 45, also lead to traffic disruptions until December 13th. A one -way regulation is set up here, which requires a detour via Villacher Schächtestraße and the B 86.
  • In addition, repair work will be carried out in Brauhausgasse by December 13, which also affect traffic.
  • From December 2 to December 18, construction site creation work in Dr.-Karl-Renner-Straße, in the intersection with Franz-von-Assisi-Straße, leads to further traffic disruptions.

These paving and expansion work are part of the efforts to improve the infrastructure in Villach and to enable access to modern technologies such as fast internet. Although these measures are necessary, this means patience for drivers in the city in the coming weeks, as unforeseen delays can occur in traffic. Current information and updates to the construction sites are via local media such as www.5min.at find.

Kommentare (0)