Full closure: traffic jam alarm at the weekend between Neunkirchen and Wellesweiler!
Full closure: traffic jam alarm at the weekend between Neunkirchen and Wellesweiler!
The A8 motorway will be completely closed this coming weekend between the Neunkirchen-Oberstadt and Wellesweiler junctions due to renovation. The closure begins on Saturday, January 11, 2025, at 2 p.m. and is expected to be lifted on Monday, January 13, 2025. The measure will be necessary to change the traffic routing due to a construction site, such as Sol.de reported.
In addition, the overtaking lane towards Pirmasens from 8 a.m. to 2 p.m. The overtaking lane is also collected on the opposite lane towards Luxembourg, so that traffic is led by a single -striped manner. Autobahn GmbH, West branch, warns of possible traffic disorders and recommends planning more time for their trips. You should also find out about current reports on radio and drive carefully on the detour route.
diversions during the closure
The detour for traffic is led from the Neunkirchen-Oberstadt junction via the L114, Zweibrücker/Limbacher Straße through Furpach to the Neunkirchen-Kohlhof junction. These measures join the existing traffic disruptions, which took place in September 2024 on the basis of the replacement new Kasbruchtal Bridge on the A8, such as blueichtreport-saarland.de reported.
The traffic safety during construction work is also set up by the West of Autobahn GmbH branch. Despite the work on low -traffic weekends, traffic disruptions are to be expected. It is therefore recommended that all road participants observe current traffic reports on the Internet and radio and plan enough time for the diverted routes.
-transmitted by West-Ost-Medien
Details | |
---|---|
Ort | Neunkirchen, Saarland, Deutschland |
Quellen |
Kommentare (0)