Construction site chaos in Schleswig-Holstein: Who has to reschedule now?

Construction site chaos in Schleswig-Holstein: Who has to reschedule now?

On January 6, 2025, a current overview of construction sites and road closures in Schleswig-Holstein informs. This information is provided daily and include a total length of the road network of 9874.557 kilometers. The overview includes details on motorways, federal roads as well as country and district roads.

The A1, A7, A21 and A23 motorways are particularly affected. On the A1, a bridge breakdown on the Cross Bargteheide between 10 and 13 January 2025 will lead to a full closure. There is also a traffic removal between Eutin and Scharbeutz, which will last until the end of 2025. A two -lane traffic routing can be expected at the Bargteheide motorway junction until December 2025.

Current construction sites

On the A7, night closings between Warder and Bordesholm are planned from January 13th to 17th, 2025. The new construction of the bridge 506 on the L49 via the A7 is expected to be continued until June 1, 2025. Another construction site area is the A21, where construction work between Bad Oldesloe-Nord and Bad Oldesloe-Süd will take place by spring 2025.

The A23 is experienced by a fundamental repair between Heide-Süd and Heide-West, which is expected to take until July 2026. Further measures concern the federal road B77, which is affected by maintenance work on the Rendsburger Kanaltunnel, as well as various roads in the state network such as the L57, L314, K2, K49 and K75, which have numerous renovation and closure work.

For a comprehensive overview of the ongoing and upcoming construction sites in Schleswig-Holstein, the website of kn-online.de . In addition, on the page of traffic situation.de Information on traffic outlet and possible dangers through construction sites and other traffic impairments can be found.

-transmitted by West-Ost-Medien

Details
OrtEutin, Deutschland
Quellen

Kommentare (0)