Clear signal tone: Future of the Altwied traffic jam system is newly illuminated!
Clear signal tone: Future of the Altwied traffic jam system is newly illuminated!
in Altwied is all about the old traffic jam system that has existed for over 100 years and is massive with residents. During an information event by the local advisory board, the audience was informed about the poor condition of the building. Flood expert Wilfried Hausmann pointed out that the Wied, from Altenkirchen, is classified as a waters with a high risk of flood. Many residents feel uncomfortable in view of the outdated state of the military system, especially since some military openings can no longer be served, as reported.
constructive discussions on the future of the traffic jam system
To ensure the safety of this traffic jam system, representatives of the local advisory board, the city of Neuwied and the hydropower plant of Süwag Grüner Energies and Wasser AG met. Manfred Reitz, head of department from the road and civil engineering office, and Dominik Kauss von Süwag explained that an investigation by the weir structure was due in the new year. This will have priority, especially after lowering the water level, which makes access easier. In the first quarter of 2025, an access to construction equipment is initially created, followed by a comprehensive analysis of the building, which is to be completed by the end of 2025, such as the
Details | |
---|---|
Ort | Altwied, Deutschland |
Quellen |
Kommentare (0)