Cappel receives new daycare: Big project for the families of the future!

Cappel receives new daycare: Big project for the families of the future!

In Marburg There is news about the planned new daycare center (day care center) in Reinhardswaldstrasse. After months of uncertainty, it is clear that the new building will take place at this location. Mayor Nadine Bernshausen (Greens) was optimistic and emphasized that the new facility will correspond to the current standards. "The daycare center will be large, beautiful and child -friendly. Here we will put our modern pedagogical concepts into practice," she said.

The construction should be completed in about two and a half years, with a planned reference skills in summer 2027. The exact costs are still unknown, but the anticipation for better care seems to be great. The current interim solution, which children look after in the old daycare center "Am Teich", only has a preliminary operating license. Building director Oliver Kutsch announced that it is currently being examined intensively how the Situation can be maintained until the new daycare center can be completed.

Cappel should receive significantly larger daycare

The facility is not only new, but also significantly larger; In the future, it will offer space for six care groups. This is necessary because an increasing need for childcare facilities in Marburg is predicted. Bernshausen made it clear that the living conditions of families change and therefore the need for reliable all -day care increases. "We want future needs to be covered with the new daycare center," emphasized the mayor.

Kutsch explained that 15 different options were examined in the selection of the location. The current location enables the construction process to accelerate, since planning law has already been set in the development plan. "This is a great location, both for the parents when bringing and picking up and picking up as well as for the necessary deliveries," explained Kutsch. With a bus stop in the immediate vicinity, there is also good accessibility.

Future of the football field

On the construction site there is currently a lawn footplace, the further whose whereabouts are currently being discussed. Bernshausen attaches great importance to the fact that it should not simply be eliminated. A possible relocation or even reduction of the sports facility is planned, so that children and young people continue to have the opportunity to play football.

The "Old Rathaus", where the groups were previously housed, was left for pollutant loads. In order to regain trust, a pollutant cadastre is currently being created. According to Kutsch, the problematic materials could be removed by spring 2025, which would enable later use of all rooms.

The next steps are to be treated with the Cappel local advisory board, which will meet in the administrative branch on Thursday, October 10, at 7 p.m. For further details on this topic, readers can use the current reporting At www.op-marburg.de view.

Kommentare (0)