Future for Mindelheim: Landratsamt plans massive expansion!

Future for Mindelheim: Landratsamt plans massive expansion!

In Mindelheim, the district office plans an extension to cope with the increasing need for jobs and the growing tasks in the Unterallgäu. The location includes the property of the district office, which is currently occupied by the agricultural office and the former agricultural school. The architecture competition for the extended authorities campus was a central part of this project, and a total of 21 architectural firms submitted their suggestions, such as Merkur reported.

The issuing of the plans submitted took place from December 16 to 20 on the fourth floor of the district office. Of the approximately 150 applications, 25 architectural offices were selected, which should submit their planning documents and models by November. A jury, consisting of District Administrator Alex Eder, district council members and experts, has evaluated the work. Criteria such as urban planning concept, design quality, economy, functionality and sustainability flowed into the ratings. Overall, the jury awarded three prizes with a total prize money of 125,000 euros.

necessity and next steps

The need for the extension is based on an expert opinion that predicts an increased need for jobs. The planned space program should include 192 offices with a total of 320 jobs in three construction phases by 2042. As part of the planning, an enlargement or new construction of a meeting room is also planned to make room for 70 district council members. The demolition of an outbuilding on Hallstattstrasse for the extension is also planned for the extension, such as "https://www.landratsamt-unterallgaeu.de/aktuelles/Pressemitteigte-detail-sicht/architecture competition-fuer---des-des-dandratsamts-startet"> Landratsamt-ahrgaeu.de reported.

The first construction phase will be sought by 2027, with two further sections in 2035 and 2042, depending on the actual need. In parallel to the expansion, an energetic renovation of the existing expansion construction from 1986 is also planned, the costs of which are estimated at 900,000 euros. This renovation is encouraged by the BAFA, measures such as the exchange of windows and the installation of a heat composite system.

Details
OrtBad Wörishofer Straße, 87719 Mindelheim, Deutschland
Quellen

Kommentare (0)