Traffic chaos in Garmisch: traffic jams because of construction sites drives drivers crazy!
Traffic chaos in Garmisch: traffic jams because of construction sites drives drivers crazy!
The uncomfortable location on the streets of Garmisch-Partenkirchen continues to increase drivers. Patience is required with a variety of construction sites, while the preparations for the winter sports season are getting closer. Despite the falling traffic volume, the vehicles are stowing every day after the high season, which puts the nerves of the drivers to the test.
A central problem is the blocking of the B23, which leads towards the market town. This situation is intensified by the ongoing work in the Farchanter tunnel, which could last longer due to technical defects. Michael Meister, spokesman for the Weilheim state building, reports of difficulties in the western tube and the need for immediate renovation measures. The good news is that the eastern tube can be accessed again without restrictions. The west tube, on the other hand, only remains open in a single lane, which is further stressed by the traffic situation.
renovation measures and current challenges
The traffic jam situation is further fueled by rock security work on the B2 between Garmisch-Partenkirchen and Klais. This work should continue until October 31, with drivers have to expect short -term full closures due to tree felling. Measures like these are necessary, but ensure significantly extended travel times.
In addition to the blocking of the B23, drivers around the north portal of the Kramert tunnel have to accept a detour, as preparations for connecting the groundwater tub must be completed. The diversions ensure that the traffic towards Garmisch has to flow over Partenkirchen, which only causes more traffic jams.
The west tube of the Farchanter tunnel was only extensively renovated at the end of July, but the responsible persons forced damage to shake covers to close again. Whether and when the west tube can be completely open is currently still in the stars. Insmeruous research is intended to clarify how the problems came about that burden so many drivers in the region.
The confusing traffic routing leads to frustration and resentment, both on the streets and on social media. Drivers must continue to be patient, while the preparations for the upcoming winter sports season in Garmisch-Partenkirchen are progressing. Despite the challenges, the hope remains that the efforts will soon lead to a relaxation of the traffic situation in order to facilitate the everyday life of those affected. The current developments related to traffic and construction sites are still a hotly discussed topic in the community.
An overview of the ongoing projects and traffic situations can be found in current articles on platforms such as www.merkur.de that provide regularly updated information. So it remains exciting how the situation in the Garmisch-Partenkirchen district will develop and whether the traffic problems will soon be a thing of the past.