Traffic chaos in Sigishofen: Last construction site expected by 2027!
Traffic chaos in Sigishofen: Last construction site expected by 2027!
Current information about an important construction site in Sigishofen, Bavarian, the commuters and travelers soon reach. The Free State of Bavaria has announced that the work on a section of the southern Alpine road will continue until May 25, 2027. The construction site concerns the B19, a main traffic route in the region that leads from Oberstdorf to Kempten.
The road construction measures are clearly felt both residents and drivers. From March 31, 2024, 7:30 a.m., all road users must adapt to possible disabilities and temporary traffic jams. The region faces an increased volume of traffic that will be inevitable due to the ongoing work. Therefore, it is advisable to be particularly attentive and to consider alternative routes.
Details of the construction work
The current road construction work includes general bridge work in addition to general road rectals. These take place in different sections. One of the most important construction sites extends over a length of 201 meters and is located between Sigishofen and Sonthofen-Süd. Here the work is also planned from March 31, 2024, 7:30 a.m., until May 25, 2027, 3:00 p.m.
Another section affects the southern Alpine road near Sonthofen. Construction work also takes place here over a length of 201 meters that have the same times as the previous construction site. This shows once again how important this route is for regional traffic and what challenges the construction sites bring.
To keep an overview of the various construction sites and their influence on traffic, the Central Office for Transport Management Bavaria is constantly publishing updates. They recommend all drivers to always check the current traffic reports to avoid inconvenience.
These extensive work are part of a longer -term plan to improve the infrastructure in the region, which often led to discussions and criticism in the past. Understandably, the question arises as to whether these measures will ultimately bring the desired improvement of the traffic flow.
In order to obtain the latest information on the traffic conditions during the construction work, interested citizens and travelers can access the platforms of the official traffic information services. This always remains up to date with all changes and restrictions that can result from the construction work.
You will receive more details on the construction site and the traffic management measures on www.news.de .
Kommentare (0)