Construction site chaos on the motorway feeder: Why the calm is surprising!

Construction site chaos on the motorway feeder: Why the calm is surprising!

On the first day of a five-week construction site at Murr motorway feeder, in the district of Ludwigsburg, the feared traffic chaos failed to materialize. Instead of traffic jams, the residents and traders experienced surprisingly quiet traffic. This positive surprise is all the more remarkable because access to the industrial area in the long field was severely restricted by a red and white barrier. During the diversions, traffic was lower than expected.

The construction site started on Monday, and those responsible had extensively informed in advance. The regional council of Stuttgart announced that from October 14th to 28th the right -wing strip from the Murrer Langen Feld will be widened, followed by a complete blocking of the motorway feeder from October 28 to November 17 for covering on the driveway to the A 81. Despite these measures, the telephones remained still at the local police and the town hall. Yvonne Schächtele, spokeswoman for the police headquarters, noticed that there were no complaints or annoying calls. Sylvia Notter, the assistant of the mayor Torsten Bartzsch, expressed something similar: "It didn't thaw down to our town hall." Even at the petrol station in the commercial area, the frequency was lower than usual.

discipline and information as a key

A reason for the smooth process seems to be the disciplined reaction of drivers. Usually not all of them adhere to diversions, but in this case many followed the given routes. The occurrence conditions for this compliance were diverse. On the one hand, the regional council informed intensively about the construction site in advance, which helped to raise awareness of the situation.

According to Alexander Meier, dispatcher of the HTL freight forwarder, truck, which were traveling from the Egarten industrial estate towards Stuttgart, could drive much more smoothly than expected. "We couldn't see any traffic jams on our displays," reported Meier. This shows that the planning and the willingness to cooperate of road users were bore fruit and enabled a smooth flow of traffic, even during construction work that normally go hand in hand with disorders and delays.

In addition, the provision of clear information on the part of the regional council also played a crucial role. Detailed maps and structural planning of the diversions not only helped the press, but also the drivers, to better adapt to the changes in traffic flow. It remains to be seen whether the peaceful traffic situation will continue on the coming days, but the first day has sustainably exceeded expectations. A positive signal for the traders and residents in Murr, who, through forward -looking planning and a collective will to respect the diversions, apparently come through this construction period without major problems.

unexpectedly shows that a well thought -out traffic concept and disciplined road users can ensure harmonious cooperation even in difficult times, which was pleasantly surprised by those present on site. In the case of further developments around the construction site and its influence on the traffic situation, those affected and residents should remain informed. The previous experience could serve as a model for future construction sites and traffic interruptions. Further details are in a current article by www.stuttgarter-nachrichten.de read.

Details
OrtMurr, Deutschland

Kommentare (0)