Traffic revolution in Eisenstadt: B52 expansion ensures free travel!

Traffic revolution in Eisenstadt: B52 expansion ensures free travel!
Investments in the transport infrastructure have an effect: Around 1.9 million euros were stuck in the expansion of the B52, one of the main access roads to Eisenstadt. The construction measures that are now completed included the expansion of lanes, the construction of a bypass and the creation of a walking and bike path. As burgenland.orf.at , these improvements are intended to significantly speed up the flow of traffic in peak times and reduce traffic jams, which is used every day by around 14,700 vehicles. State Councilor Heinrich Dorner emphasized that the needle, which had led to backlogs towards Eisenstadt in the morning, had now been removed. From Thursday the road can be used again without restrictions.
traffic times and their importance
The changes in the transport infrastructure are particularly important because they have a direct impact on the daily commuter flows. According to the analysis of the traffic times, traffic demand behaves inelastic during the rush hours, which usually take place from 6 a.m. to 9 a.m. and from 4 p.m. to 7 p.m. on working days. Above all, the trip to work and school leads to high traffic and frequent traffic jams during this time. The transport companies adapt their timetables accordingly in order to meet this demand, as de.wikipedia.org . These findings make it clear that the recent construction work was carried out, taking into account these traffic times in order to master the daily challenges in road traffic.
The measures to improve the B52 are part of a more comprehensive strategy to optimize the flow of traffic and increase mobility in the region. The combination of individual mobility solutions on the bike and the promotion of effective transport connections shows that those responsible put the needs of commuters in the foreground.
Details | |
---|---|
Ort | Eisenstadt, Österreich |
Quellen |