Construction site chaos in the city: Transport turnaround from March 17, 2025!

Construction site chaos in the city: Transport turnaround from March 17, 2025!

Brückenstraße, 52355 Düren, Deutschland - The traffic situation near Vienna will be significantly redesigned from March 17, 2025, since a comprehensive renovation of the Southeast Tangent in the direction of travel will begin. Preparatory measures were taken in the previous year, and the expansion of the breakdown strip to an additional lane, the so -called trough lane, has now been decided. This is intended to optimize the traffic flows and carry out maintenance work efficiently. According to the ASFINAG regional manager Brigitte Müllneritsch, a new coloring system is introduced to make it easier for drivers to choose the right track, especially for those who want to depart on the Handelskai. The construction site will be handled in three phases over a period of June 23, 2026, with diversions and sporadic closures to keep the flow of traffic in a controlled href = "https://www.kleinezeitung.at/service/newsticker/chronik/19463049/sUedosttangente-bei-prater-hochstrasse-werd--sanated"> reported.

Current changes in the B56N

At the same time, the B56N will be affected at the intersection with the bridge road. In the night of Friday, October 28, 2022, on Saturday, October 29, the traffic routing will be changed. The closure in the direction of travel will be lifted on Saturday morning, which means that the traffic is now led in both directions, each lane past the construction site. A speed limit of 30 km/h applies on site. The traffic light system at the intersection remains off for the time being, so that traffic can flow through red light phases without interruptions. Brückenstraße remains closed to vehicles, but the intersection for rescue and emergency vehicles is at any time accessible, which is of crucial importance for the emergency services, such as

Details
OrtBrückenstraße, 52355 Düren, Deutschland
Quellen

Kommentare (0)