Traffic chaos in Tyrol: Large construction site ensures nightly noise pollution!

Traffic chaos in Tyrol: Large construction site ensures nightly noise pollution!

An important construction project on the A13 burner motorway is imminent: From the evening of March 22, 2025, the Lueg Bridge will be demolished, which will have a significant impact on traffic. The highway is closed on the night between 8:00 p.m. and 6:00 a.m., a detour was signposted for relief, which leads via Tiroler Straße, as reported orf Tirol . In order to tear down the 51 meter long bridge, the road must be increased by 40 centimeters so that the severe demolition excavators do not cause any damage.

The project also requires a comprehensive master plan for traffic in order to control passage and not to put a strain on local roads. From January 1, 2025, driving bans will apply to the Wipptal and the Innsbruck area to optimize the flow of traffic on the main streets. These measures range until February 28, 2025, daily from 7 a.m. to 7 p.m., reported Asfinag .

traffic management and public transport adjustments

In order to improve the traffic situation, five new dosing lights are put into operation on the B182, which automatically regulate traffic, depending on the number of vehicles. These measures are intended to ensure that traffic runs smoothly during the construction work and that the residents are not restricted in their mobility. In addition, the public transport offer in the region was increased to better bring the citizens to their goals and to relieve traffic.

Details
OrtInnsbruck, Österreich
Quellen

Kommentare (0)