Ligist during the start: new childcare and exciting projects in focus
Ligist during the start: new childcare and exciting projects in focus
In Ligist, the continuous population growth ensures an increase in demand for childcare facilities. Mayor Roman Neumann and his team therefore deal intensively with topics such as childcare and other infrastructural developments. The elementary school recently received a new group room for the all -day school, and an emergency power supply was also installed to minimize future security risks.
The new school building can now react better to the growing needs of the population. There are two groups in the kindergartens ligist and underwald, and a bus service has been set up for the Unterwald kindergarten. A lot has also been invested for elementary school recently: each class has now been equipped with a projector, and the new group room can be used both as a lesson and as a leisure area. Here it becomes clear how important the modernization of the educational institutions in Ligist is.
planned extensions and security measures
Another measure is the planned expansion of the kindergarten in Ligist, where a third group will soon be added. The work for this will be awarded in the coming months and the majority of the construction work will be carried out during the summer vacation. In order to do justice to the security standards, the staircase was separated in the elementary school, and a new emergency generator was purchased in the course of blackout prevention.
On the question of security, Neumann confirmed that the Ligist fire brigade would serve as a central point of contact during a possible blackout. Here the fire brigades of Steinberg and Ligist will set up emergency sites to support the population in an emergency. In addition, the armory is also equipped with photovoltaic systems to optimize the energy supply.
infrastructure measures in the town center
ligist is also alive in the infrastructure. The neglected pedestrian bridge has now been renovated, and projects such as the Kohlgrubenweg are continued until the planned bathroom street renovation in 2026. The mayor said that preparations for the upcoming work are already in full swing.
Another future -oriented project could be the establishment of an energy community. Neumann reported discussions with the company SO-Strom, which strive for a cooperation between the Ligist and neighboring communities. Such an energy community is intended to help bundle the efficiency of photovoltaic systems and thus generate long -term economic advantages.
There are also exciting things to report in the area of gastronomy: After a successful bathing season, a new tenant is being sought for the outdoor pool. In addition, the Musikverein Ligist-Krottendorf will receive a new costume next year, which underlines the cultural vitality of the community. Cooperation between the citizens and the community remains a central point, because not only the feedback from the citizens is taken seriously, but many suggestions are also actively implemented.
For further information on the developments in Ligist and the planned measures, interested parties can be the current reporting on www.meinbezirk.at pursue.
Kommentare (0)