New shine for the B 7: Eibesbrunn shines after extensive renovation!

New shine for the B 7: Eibesbrunn shines after extensive renovation!

Eibesbrunn, Österreich - On May 23, 2025, the official construction of the renovation of the state road B 7 in Eibebrunn, Mistelbach district, was celebrated. Under the presence of Federal Councilor Michael Bernard, Vice Mayor Robert Knie and DDI Christian Schrenk-Glechner, those responsible announced that the work was successfully completed. This measure was urgently needed because the roadway no longer corresponded to the traffic standard, which was expressed by damage such as suppressing and tracking channels.

The renovation work included an area of ​​around 3,250 square meters and extended over a length of 430 meters. During the renewal, the existing road was milled down to a depth of five centimeters. A new bituminous support and top layer was applied to the milled surface, with the asphalting work carried out by the Held and Francke building.

traffic infrastructure and costs

The total cost for this second construction phase amounts to around 140,000 euros, which are fully borne by the state of Lower Austria. During the one -week construction period, the traffic routing was maintained on the side in order to ensure certain accessibility during the work. The Wolkersdorf road maintenance department also adapted the banquet to the new circumstances and ensured the necessary soil marking.

The average traffic flow in this area is around 6,500 vehicles per day. In order to keep the traffic in the area of ​​the construction site smooth, no special hazard reports or restrictions in the traffic flow were registered, such as risk of slipping or obstacles on the road, which can provide complications in other regions Tagesschau.de .

These challenges underline the need to take measures to improve and maintain traffic routes. In this context, measures such as increasing the funding for bridge renovations from 2026 and an increase in annual funds to 2.5 billion euros have already been announced. Governments are asked to develop suitable strategies in order to meet the growing number of projects and to remedy the renovation backlog ots.at .

Details
OrtEibesbrunn, Österreich
Quellen

Kommentare (0)