Fire on construction site at the Großhadern Clinic: Rapid action saves!
Fire on construction site at the Großhadern Clinic: Rapid action saves!
on Tuesday evening, May 20, 2025, a fire broke out on a construction site at the Großhadern Clinic in Munich. The alarm was reported at 6:26 p.m. by a caller to the integrated control center in Munich, as fireworld.at . The fire site was on the fifth floor of the clinic, which is currently being rebuilt.
An attentive employee of the clinic discovered the flames and immediately started extinguishing attempts with several fire extinguishers. Shortly afterwards, the Munich fire brigade moved in to cope with the situation. Emergency services deleted the burning building materials under respiratory protection and brought the fire goods down by means of a construction site elevator, where it was checked. In order to prevent the fire from spreading, the affected areas were extracted with a high -performance fan.
efficient emergency measures
Thanks to the quick action of the employee, a possible fire spread could be prevented. According to tz.de there was no danger for people, since there were no patients in the building at the time of the incident stopped.
The fire alarm system in the opposite clinic building was activated by push -button detectors, which caused the emergency services to control the situation. The fire brigade checked all affected areas and reset the fire detectors. So far, no information on the amount of property damage or the exact cause of the fire is known.
fire protection and safety standards
fire protection is an essential topic on construction sites because the protection of life, environment and public security is a priority. Measures to prevent the development and spread of fires are taken, as it explains bunormenlexikon.de . This includes both preventive and defensive fire protection, which includes technological and organizational measures.
The structural fire protection is particularly important when the buildings are built or converted and includes suitable escape routes, fire brigade access and extinguishing water supply. Fire protection concepts must be developed by specialist planners and should take special requirements for the materials and their fire resistance into account.
The events at the Großhadern Clinic illustrate how important quick action and the correct training of the staff are in emergency situations. The measures and regulations on fire protection make a significant contribution to dealing with such incidents safely and minimizing the effects for everyone involved.
Details | |
---|---|
Ort | Klinikum Großhadern, München, Deutschland |
Quellen |
Kommentare (0)