Refurbishment of the A2: Risk of traffic jams between Pinkafeld and Oberwart!
Refurbishment of the A2: Risk of traffic jams between Pinkafeld and Oberwart!
The second phase of the extensive renovation of the A 2 South Autobahn begins on Monday, March 3, and is initially carried out between the Lafnitztal-Oberwart and Pinkafeld junction. This measure affects an almost 40 -year -old traffic strip that urgently needs to be renewed. The road, bridges and transfer towards Graz receive a comprehensive refreshment, such as ORF Burgenland . The completion of the work will be sought for the end of November 2025.
During the construction work, the drivers have narrowed lanes available in both directions, which results in a speed restriction of 80 km/h. Drivers have to prepare for possible delays. The area around the Loipersdorf rest station is also being renovated. Last year the road was renewed in the direction of Vienna, and how The Kleine Zeitung are explained for the next year in the section between Pinggau and Pinkafeld planned.
important changes in traffic
The renovation work is expected to have a significant impact on the flow of traffic. Only two narrowed traces per direction of travel can be expected to be particularly high traffic loads and longer travel times. Motorists should consider alternative routes to avoid traffic jams. ASFINAG plans to carry out all work quickly in order to keep the restrictions on road users as low as possible.
Details | |
---|---|
Ort | Lafnitztal-Oberwart, Österreich |
Quellen |