Atzenbrugger tunnels after flood again - travel time saved!

Atzenbrugger tunnels after flood again - travel time saved!

In September, the Atzenbrugger tunnel was affected by devastating floods, which brought water and mud up to 2.5 meters high, which massively damaged cables and safety devices. After a three -month lock, the tunnel will now be released for traffic again on Sunday, as orf.at . The last test drives between St. Pölten and the Tullnerfeld train station have already taken place on Saturday morning. Commuters between Linz and Vienna can look forward to, because the travel time is now shortened by 20 to 30 minutes. Linz leaves the first western railway at 6.06 a.m., while the first Railjet rushes over the Tullnerfeld again at around 5:30 a.m.

A comprehensive repair of the route is estimated at around 100 million euros, although the exact costs can only be determined after all work has been completed in the summer of 2025. The ÖBB describes the reopening of the western route as a "Christmas miracle", which could only be achieved by clever empty empty empty spare parts bearings and provisional solutions. The route will be closed again by June 5, 2025 to carry out final work, while long -distance trains have to be temporarily managed by the Wienerwald.

coordination under high pressure

The storm low anet had also caused massive disorders. Raimund Vavra from ÖBB-Infrastructure AG reported that the first disorders occurred on Saturday afternoon, which made work on the facilities difficult. In order to pump the water out of the tunnel, a quick interaction with the fire brigade was created, which significantly increased the efficiency of the clean-up work, such as ÖBB- Infrastructure The tunnel was once again a scene of teamwork under extreme conditions when everything was done to get the pumping systems running and to initiate the cleaning work quickly.

Details
OrtAtzenbrugger Tunnel, Österreich
Quellen

Kommentare (0)