Solar park in Lüdingworth: Construction work for green energy!
Solar park in Lüdingworth: Construction work for green energy!
In the area of Lüdingworth, the construction work is progressing for a new solar park, which should play an important role in covering the electricity requirement of a five -digit number of households. According to CNV Medien , enerparc AG started installing the standing plant last year. The solar park is in the immediate vicinity of the A 27, which is favored by a legal regulation that was passed in 2023 and enables the disposal of the land use plan procedure for open space photovoltaic systems in a 200 meter wide corridor along motorways or multi-track rail routes.
The total area of the project comprises around 47 hectares, with around 17 hectares in the privileged area. While the parking part on the highway is already in the construction phase, building law must first be created for the areas turned away from the highway before other solar tables can be installed. In the summer, the municipal committees adopted a implementation contract for a project -related development plan. The area is to be declared as a "special area of solar park". While the building permit for the parking part outside the 200-meter belt is still uncertain, the B-Plan method for this section should start in March.
solar power initiative in Rhineland-Palatinate
parallel to the development of the solar park in Lüdingworth, Enerparc AG has also developed an important solar cluster in the district of Cochem-Zell, Rhineland-Palatinate. After three years of construction, all nine individual systems of the cluster, which have a total output of 192 MWP, now dine into the public power grid, such as PV Magazine reported. These systems are able to supply around 54,000 households with green electricity annually. At the official inauguration, which took place in Grenderich, climate protection minister Katrin Eder emphasized the importance of the project for the climate neutrality of Rhineland-Palatinate until 2040.
The project in the district of Cochem-Zell was implemented with a solidarity pact to benefit the municipalities and citizens. In order to protect the landscape, complex earthworks were carried out to connect the systems, including bores under the Moselle and a railway line and two mountains. Enerparc also plans to implement nine other projects in the community, which together are supposed to generate around 100 megawatt hours of solar power every year. Five of these new facilities are to be completed by mid -2025 and the remaining four by the end of 2026.
-transmitted by West-Ost-media
Details | |
---|---|
Ort | Cuxhaven, Deutschland |
Quellen |
Kommentare (0)