Changes in traffic in Bad Kreuznach: Salinenstraße will be regulated!
Changes in traffic in Bad Kreuznach: Salinenstraße will be regulated!
From January 15, 2024, there will be a change in traffic management at Salinenstraße 42-50 in Bad Kreuznach. This was announced by the city administration. The decision to redesign is based on security concerns, since the bus lane is closed to traffic on the paving area.
The original planning for the implementation of this measure was planned for the past year. As part of these changes, the left -turn lane is dismantled to the water swamp in order to better absorb the traffic flowing around the city. The traffic that wants to swamp a water is diverted via Rheingrafenstraße, Baumgartenstraße and Zimmerengasse. Nevertheless, it remains possible to turn into the water into the water.
goal of the measure
The main goal of the measure is the optimization of the traffic flow and the increase in security for all road users. It is worth noting that the traffic routing via the bus lane was introduced in the course of the “Salinenquartier” construction measure.
In addition, at the Salinental stop in Bad Kreuznach, which is served with the bus lines 251, 201, 253 and 222, is currently made by the website Timetable bus railway No current departure data available. Users are asked to choose a later date for the query. The buses usually run daily, with the first bus on line 251, which goes to the Bad Kreuznach train station on Mondays at 5:01 a.m., and the last bus on line 222, which leaves at 8:17 p.m. All bus lines run regularly, also during the Covid 19 pandemic, and it is advised to find out about the necessary hygiene rules.-transmitted by West-East media
Details | |
---|---|
Ort | Bad Kreuznach, Deutschland |
Quellen |