A61 full closure: Stammfarf Farming between Bad Kreuznach and Bingen!

A61 full closure: Stammfarf Farming between Bad Kreuznach and Bingen!

Attention, drivers! A large traffic chaos is imminent: The A61 in Rhineland-Palatinate will be completely closed from November 10 to November 10, 2024 in the direction of Koblenz! The highway between Bad Kreuznach and Bingen is closed for urgently needed repair work. This could lead to considerable traffic jams in the direction of Koblenz - so it is better to plan the routes!

closure and detour in detail

The block begins on November 8th at 8 p.m. and ends on November 10th at 2 p.m. The detour takes place via the single -track parallel lane in the Nahtal motorway triangle, where the traffic is guided past the construction site. After the triangle Nahe valley, the drivers can return to the main lane. It is important to adjust to the changed traffic conditions, because the work is essential!

But be careful: the blocking could also be postponed, depending on the weather conditions. Autobahn GmbH has announced that the work is "under the reservation of suitable weather". If the weather does not play along, the appointment could change. However, the urgency of the repair work suggests that the closure is made up for promptly. In spring, the A61 had to be closed due to renovation work on the Moselle Valley Bridge - the memories of traffic jams are still fresh!

Details
OrtBad Kreuznach, Deutschland

Kommentare (0)