Important subway routes in Frankfurt on Sunday closed due to construction work!

Important subway routes in Frankfurt on Sunday closed due to construction work!

On Sunday, December 8th, a central subway connection in Frankfurt is temporarily interrupted due to important work on driving electricity reinforcement. This drastic measure affects the route between "Hügelstraße" and "Heddernheimer Landstrasse" and is in force from 6 a.m. to 4 p.m. During this time, buses run on this route instead of trains. The lines U1, U2, U3, U8 and U9 are affected, such as FR.DE . In particular, line U2 is set and the U8 will not be able to run either.

changes in the timetable and replacement traffic

The Rhein-Main-Verkehrsverbund (RMV) has announced extensive changes in the timetable to meet the traveler. The line U1 between "Südbahnhof" and "Hügelstraße" will drive in a five -minute time, while the rail replacement (SEV) brings passengers to Heddernheimer Landstrasse. There is the possibility to switch to the lines U3 and U9 that are on new, expanded routes. In addition, a connection from Ginnheim via Nieder-Eschbach to Gonzenheim for the U9 is set up, such as frankfurt.de

This work in the north of Frankfurt are part of a comprehensive project to improve the power supply for the U-Bahn, in particular to support the new, more powerful vehicles. The VGF has already put a new rectifier on Hessestrasse into operation, which optimizes the energy supply. The existing rectifier works will be revised or rebuilt to meet the new technical requirements and increase the supply of driving power to 750 volts. This Sunday the old rectifier work, which can no longer be expanded, will be taken out of operation.

Details
OrtFrankfurt, Deutschland
Quellen

Kommentare (0)