Bridge in Feldberg: Half -side closure for repair from Monday!

Bridge in Feldberg: Half -side closure for repair from Monday!

Feldberg, Deutschland - in Feldberg, in the picturesque district of Mecklenburg Lake District, the bridge that connects the two lakes narrower and wider Luzin will become a construction site from Monday! The repair work announced by the Neustrelitz road construction office is necessary to ensure security for boat drivers. Kanthölzer and boards that act as impact protection are exchanged.

The bridge is blocked on each side during the work, which means that traffic can only flow to a limited extent. Drivers have to adapt to possible delays, because the measures are created for a maximum of five days. The responsible authorities ask for understanding and patience during these important renovation work, which should increase security on the waters.

important details about the construction site

  • Location: Feldberg, district of Mecklenburg Seenplatte
  • Start of work: Monday
  • duration: a maximum of five days
  • affected bridge: connection between narrow and wide Luzin

The repair is not only a technical necessity, but also a step to improve the infrastructure in the region. The bridge plays a crucial role in local transport links and boat traffic on the lakes. Stay tuned for further updates for this exciting construction project!

Details
OrtFeldberg, Deutschland

Kommentare (0)