Full closure of the K 85: Construction site goes during the winter break!

Full closure of the K 85: Construction site goes during the winter break!

Wetter, Deutschland - Currently there is construction site chaos in the Marburg-Biedenkopf district! Kreisstraße 85 between Wetter-Warzenbach and Wetter-Treisbach has been quiet since October for urgently needed road covering. But now the bitter message comes: Due to a defect in the asphalt mixing, the delivery of the required asphalt has stalled. Therefore, the construction site will be sent into a winter break from Monday, December 16, which means that the full closure remains. The road is currently in an unavoidable state, which does not make the situation easier for residents and road users, as the details on Mobil.hessen.de

traffic disruptions also in Biedenkopf

Not only the K 85 ensures traffic passes. There are also several street projects in Biedenkopf, as the road traffic authority noted. From Monday, September 16, Hospitalstraße will be renovated on the K 83 between "Am Bahnhof" and "on the Breitenwiese". This 760 -meter -long route will also be fully blocked for about two weeks, while the asphalt layers are replaced. The construction work is designed in such a way that they are spread over several sections. In each area, in addition to the renovation, the street channels are also renewed and confluence is adapted. In addition, the detour is adjusted and the corresponding signs are set up to guide road users, such as further information from op-marburg.de

For commuters and residents, this means an immense change in everyday traffic. During the construction work, numerous bus lines are diverted, which brings additional complications for passengers. The inconveniences are expected to stop until the completion of the street work in November.

Details
OrtWetter, Deutschland
Quellen

Kommentare (0)