Traffic chaos in Potsdam: New closures and construction sites in December!

Traffic chaos in Potsdam: New closures and construction sites in December!

This week numerous construction sites and road closures are carried out in Potsdam, which significantly affect traffic. From Monday, December 9th, the Caputher Heuweg will be completely closed between house numbers 49 and 63 due to road construction work by the end of March 2025. There are also restrictions on Nuthestrasse: On Wednesday and Thursday, a lane will be blocked between the Humboldt Bridge and Humboldtring from 4 a.m. to 6 a.m. href = "https://www.tagesspiegel.de/potsdam/landeshaupstadt/sperrung-der-nuthestrasse-in-potsdam-woes-woche-traffic scablungen-gt-12832049.html"> The Tagesspiegel reported .

full closures and lane renovations

In addition, there are several construction sites, some of which also have an impact on public transport. Friedrich-Ebert-Straße remains completely closed until January 31, 2025 due to track construction work, which leads to changes in tram and bus traffic. Pedestrians have to use alternative routes because bicycle traffic in the construction site is no longer permitted. The Kaiser-Friedrich-Straße is also closed on the Tempelberg and the old Mörtelwerk on half side until Friday, and Tristanstrasse in Groß Glienicke is completely closed from Tuesday to Friday from 6 a.m. to 6 p.m. href = "https://www.mobil-potsdam.de/de/baustelle/aktuell/"> mobil-potsdam.de .

Further closures can be expected on Potsdamer Straße in Bornstedt and Robert-Koch-Straße in Babelsberg. The short -term full closures at different intersections and the effects on private transport must be particularly noted. The construction work in Hegelallee should also be completed by December 20. Citizens are asked to adjust to longer detours and extended travel times.

Details
OrtPotsdam, Deutschland
Quellen