Important blocking: Tunnel Vötting closed from October 28th for maintenance!

Important blocking: Tunnel Vötting closed from October 28th for maintenance!

Vötting, Deutschland - The city of Freising announces an upcoming blocking of the Vötting tunnel, which lasts from Monday, October 28, 2024, 8 a.m. until Thursday, October 31, 2024, at 6 p.m. This closure is necessary to carry out six months of maintenance and the thorough cleaning of the tunnel.

Those responsible explain that such regular maintenance work is of great importance to ensure the safety and functionality of the infrastructure. The city emphasizes that the work helps to extend the lifespan of the tunnel systems and to minimize potential risks.

diversion routes for road users

For drivers who travel from the direction of Allershausen via the ST 2084, Thalhauser Straße, several diversion routes have been set up in order to bring those affected safely and without major delays. The detour runs as follows:

  • About the roundabout on the left in the Weihenstephaner Ring
  • Change to the Wettersteinring
  • Karwendelring via the Mainburger Straße roundabout towards the south
  • turn left at the intersection of Mainburger Straße and Landshuter Straße in Landshuter Strasse
  • turn right at the intersection Landshuter Straße and Kölblstraße in Kölblstraße
  • Turn right at the Kölblstraße and Dr.-von-Daller-Straße to Dr.-von-Daller-Straße
  • via Ottostraße
  • and finally on Münchner Straße (ST 2350), towards the airport and Westtangente (FS 44), Munich

In addition, a detailed diversion is also made available for drivers who come from Münchner Straße (ST 2350):

  • turn into Ottostraße
  • Movement to Dr.-von-Daller-Straße
  • left into Kölblstraße at the intersection Dr.-von-Daller-Straße/Kölblstraße
  • left to Landshuter Straße at the Kölblstraße/Landshuter Straße
  • Follow the Landshuter Straße
  • right into Mainburger Straße at the intersection Landshuter Straße/Mainburger Straße
  • from the roundabout towards Karwendelring
  • continue via the Wettersteinring
  • and finally in the Weihenstephaner Ring
  • turn right at the roundabout towards Thalhauser Straße ST 2084 and Allershausen

The preliminary information about the blocking and the planned diversions is considered necessary in order to optimally control the traffic rivers and avoid traffic jams in the area around the construction site. City management plans to inform the residents about the upcoming changes in good time so that the impairments can be kept as low as possible. Further details are www.freising.de to be found.

Details
OrtVötting, Deutschland

Kommentare (0)