Refurbishment of the Isar Bridge: Large diversions from October 21!
Refurbishment of the Isar Bridge: Large diversions from October 21!
In the Freising district, there is an important renovation: the Isar Bridge on the FS 13 district road at Oberhummel will be extensively renovated in the coming years. In order to prepare this larger measure, however, in -depth investigations of the building primer and the bridge structure are announced.
From October 21 to November 8 of this year, the relevant work will take place. During this period, the route for all traffic is completely closed. The blocking begins at the access to the parking lots on the Isar, but these remain available.
detour of the traffic
The redirection of the traffic from Langenbach starts from the intersection with the state road 2350. Vehicles are led to Moosburg via Staatsstraße 2085, and from there via the ST 2331 (Rosenau) and the ED 24 to Gaden. The detour routes are signposted for the accommodating traffic, so that drivers should easily find their way.
This measure was necessary to ensure the safety and longevity of the bridge. The bridge is a relevant traffic route for the region, and the work invested in it is designed to identify and remedy any damage at an early stage.
Additional information about the exact diversions and the duration of the work available on www.kreis-freising.de . It remains to be seen how the work will affect the traffic volume in the region.
Kommentare (0)