Traffic chaos in Unterschneidheim: closure of the K3209 from now on!

Traffic chaos in Unterschneidheim: closure of the K3209 from now on!

In the coming week there will be considerable traffic disruptions on the K3209 in Unterschneidheim and Minderoffingen. From October 17, 2024, 7:30 a.m. until October 25, 2024, 3:00 p.m., various construction work will severely restrict the passage on this route. Drivers have to adapt to staggering traffic and an increased risk of storage, especially at narrow points and in the immediate areas around the construction site.

These measures are part of the necessary maintenance work, which serve to ensure the safety and quality of the streets, which are often heavily stressed in the German road network. It is a construction site with a length of 1.3 km, which affects both the connection between Geislingen and the B25 and the direct route to Minderoffingen.

Details on traffic impairment

The exact information about the restrictions are as follows:

  • Location: Unterschneidheim (ZIP 73485), K3209, between Geislingen and B25
  • period: October 17, 2024, 7:30 a.m. to October 25, 2024, 3:00 p.m.
  • detour: B25 - Don5 - Unterwiflingen - Geislingen and vice
  • Location: Minderoffingen (ZIP 86748), DON13, K3209, between B25 and Geislingen
  • period: October 17, 2024, 7:30 a.m. to October 25, 2024, 3:00 p.m.
  • detour: B25 - Don5 - Unterwiflingen - Geislingen and vice

It is strongly recommended to observe the traffic information on site and, if necessary, use alternative routes to avoid the effects of the construction work. Drivers should also adapt their driving behavior to not only protect themselves, but also other road users.

These current traffic information comes from the Central Office of Transport Management of the State Bau Directorate Bavaria and are updated to inform the public about developments and innovations. Further details and information on this topic can be found in a comprehensive report at www.news.de .

The health and security standards are always preserved during the construction work in order to keep the impairments as low as possible. It remains to be seen how the situation will develop, but an early adaptation of the travel plans could help minimize the inconvenience.

Details
OrtUnterschneidheim, Deutschland

Kommentare (0)