Stau-chaos on the B27: Patience asked at Balingen construction site!
Stau-chaos on the B27: Patience asked at Balingen construction site!
Balingen, Deutschland - A top -class traffic chaos occurs on Tuesday evening on the B27 near Balingen! Drivers have to adjust to several kilometers of traffic jams while the commuters' nerves are put to the test. Patience is required because the construction site situation ensures massive delays.
Currently take place on the access to the B463 between the Gehrn industrial estate and Balinger Straße (Frommern). Working on the access from the Gehrn industrial area towards Albstadt has already started and lead to a real traffic jam disaster. From Balingen-Mitte, the traffic is converting towards Endingen and B463, and drivers can prepare for a long waiting time.
traffic jam alarm for descendants!
If you want to leave the B27 towards Gehrn and Albstadt, you have to prepare for considerable delays. The current status (5:38 p.m.) shows that the detours and closures force drivers to their knees. The two -lane road of the B463 is narrowed into a single trace in the construction site area, which also tightens the location. But that's not the only construction site in the Zollernalb district - there are currently massive traffic disruptions and diversions in other places.
Details | |
---|---|
Ort | Balingen, Deutschland |
Kommentare (0)