Innovative construction: Blumberger company revolutionizes housing!

Innovative construction: Blumberger company revolutionizes housing!

In Blumberg, Steuer Bau GmbH is driving an innovative construction that not only increases efficiency, but is also independent of the weather. The managing director Dirk Baumgärtner emphasizes that the use of prefabricated modules makes the construction process considerably easier. "The physical stress of our employees is minimized because the heavy work such as lifting and bending down is eliminated," he explains. Thanks to modern machines, the heatable hall is produced, which enables a gentler handling of the resources.

According to the Chamber of Crafts, one of the biggest challenges in the construction system is the acute shortage of skilled workers. "We used to start with many trainees in the industry, today there are only a few left," said Baumgärtner. This urges companies to find solutions in order to maintain operation and at the same time to comply with the necessary standards.

flexible modular construction

The innovative approach is not only shown in physical relief, but also in time savings. "We can implement projects much faster, such as a senior housing complex, which was quickly completed despite adverse winter conditions," emphasizes Baumgärtner. The construction of modules within the hall means that construction times are significantly shortened and costs are minimized.

The flexibility is another important feature because the modules can be made from different materials. "We are not bound to a specific manufacturer and can adapt the elements according to the project requirements," says Baumgärtner and adds that the modules can already be delivered with windows, electrical installations and plaster. This increases efficiency and simplifies the entire construction process.

Sustainability also plays an important role in this new construction. The production of the modules hardly causes waste, and the materials used should be resource -saving. "The solar system on the roof of the production hall also ensures that the necessary energy is generated environmentally friendly," explains Baumgärtner.

operating adjustment in times of crisis

The decision of Steuer Bau GmbH to invest in prefabricated modules was made a few years ago. Baumgärtner is optimistic about the future development of the construction industry. "Despite the current economic uncertainties, such as the sunken KfW funding, I believe in a recovery of the market. We are ready when demand is increasing," he says.

The need for fast and cost -efficient construction methods is currently particularly available for larger construction projects that benefit from the modular construction. However, smaller companies seem to be less interested in more efficient methods, which tree gardeners consider questionable: "The industry could stand in the way in the upcoming economic stimulus phase if it does not rely on innovations," he warns.

Overall, the company shows with its new construction that it not only sets a positive sign against the shortage of skilled workers, but also works gently and innovatively. This development could give a positive impulse for the entire industry and mitigate the challenges of the future. Details on this topic are in a detailed report to be found on www.suedkurier.de

Kommentare (0)