Ravensburger playground in need of renovation: security for children is improved!
Ravensburger playground in need of renovation: security for children is improved!
In the heart of Ravensburg there is a small playground that urgently needs a refreshment. The play area behind the town hall, where children are usually fun, was temporarily closed due to security concerns. The reason: the fall protection plates among the play equipment had loosened from their joints and represented a real risk for the little adventurers. An immediate reaction from the city was necessary, and so the area was blocked to initiate measures for renovation.
like Timo Hartmann, spokesman for the city of Ravensburg, explains that the old play equipment is now being launched comprehensively. The dilapidated fall protection plates that had become a real handicap have already been removed. A seamless fall protection covering is installed in your place, which is installed by a specialized specialist company. This innovative covering has the advantage that it cannot bend upwards as before with joints. This significantly improves security for the children playing.
new play equipment and innovative concepts
In addition to the new fall protection panels, the playground itself will also receive a new face. The old play equipment, which were originally put into operation in 1999, including a rotary circle and a pivot point, are replaced by modern individual play equipment as part of the renovation. These new devices are installed in floor sleeves, which enables simpler disassembly for future events, explains Hartmann. "This new system makes it easier to organize events because the devices can be removed faster and more efficiently," says the press officer.
The old play equipment does not simply come to the scrap place. Instead, the urban depot will process you, repaint and reinstall it at another location. This measure shows that the city of Ravensburg not only has security, but also sustainability by using existing resources efficiently.
The city has set itself the ambitious task of completing the renovation work by November. The reason for this tight schedule is the weather dependency when installing the new fall protection covering. The future costs for the extensive renovation of the playground amount to around 10,000 euros, which the city is willing to invest for the safety and the well -being of the children.
This step to renew the playground behind the town hall is more than just a cosmetic refresher. It is an important step to create a safe and inviting environment for the children of Ravensburg. Parents and children can soon look forward to carefree hours outdoors without having to worry about possible dangers. Updates for the progress of the project are expected, and further details are available soon, as reported www.schwaebische.de .
Details | |
---|---|
Ort | Hinter dem Rathaus, 88212 Ravensburg, Deutschland |
Kommentare (0)