New fire station in Kellenhusen: Building for 2025 planned!

New fire station in Kellenhusen: Building for 2025 planned!

Kellenhusen, Deutschland - The fire brigade Kellenhusen is preparing for a big change: A new fire service equipment house is being built for a proud 3.3 million euros, since the existing building no longer meets the requirements. According to the mayor of Kellenhusen, Stefan Schwirtt (CDU), construction is expected to begin in 2025. This modern structure will offer three gate entrances, new sanitary facilities and common rooms, and is to be energetically equipped on the latest stand, including a solar system and a heat pump. Schwoldt also sees this new building a chance to win new members for the fire brigade, even if the current team strength with 35 active people is already described as satisfactory href = "https://www.ln-online.de/lokales/ostholstein/kellehusen-feuerwehr-neues-geraethaus-hlgemfww35bfbjinjxkxx5y.html"> ln-online.de reported

gas smell in the building

On February 11, 2024, the fire brigade was alerted due to the smell of gas in a building on the Fahrenhorst. Residents had noticed the smell in the basement, and the danger could be confirmed in the event of an exploration. The fire brigade cleared the building, while a group parked the gas supply of the heating system and ventilated the basement. In addition, the fire truck dangerous goods and the gas supplier were brought in. After the danger for the residents could be excluded, they were allowed to return to their apartments, such as Findglocal.com In addition to the Kellenhusen fire brigade, the Dahme fire brigade and other support units were also involved.

The planning for the fire brigade and other projects, such as the planned construction of a new building yard on Kirschenallee, are underway. The municipality is aiming to advance important construction projects, even if the implementation of concrete projects, such as the complete renewal of Ostlandstrasse, must initially wait. The mayor explains that comprehensive plans should be started in 2025.

Details
OrtKellenhusen, Deutschland
Quellen

Kommentare (0)