Groß-Gerau: Full closure of the L 3261 from Monday-note the diversion!

Groß-Gerau: Full closure of the L 3261 from Monday-note the diversion!

Hähnlein, Deutschland - A traffic chaos is imminent! From November 11th, the state road L 3261 will become a large construction site in Hähnlein. On behalf of the Groß-Gerau from Hessen Mobil, extensive construction work to renew the road drainage starts. The Markstraße between Gartenstraße and Ringstrasse will be completely closed for two weeks. Watch out drivers: The detour leads from Gartenstraße via the local road network. However, the access to the ring road remains open.

What is behind the construction site? Street drainage is brought to the fore! New channels and additional enema should ensure better water drainage. A project that the state of Hesse costs around 25,000 euros. The work should be completed by the end of November, but until then the residents say: patience is required!

diversions and costs

The full closure of the L 3261 is essential to carry out the construction work safely and efficiently. The detour via the local road network has already been signposted in order to steer traffic as smoothly as possible. The costs for this important infrastructure project are fully borne by the state of Hesse, which underlines the importance of the measure.

Details
OrtHähnlein, Deutschland

Kommentare (0)